CSC 581 Computer Support for Knowledge Management Milestone Week 2

This part of your documentation defines the project, the user requirements, the respective evaluation criteria, and the targeted completion date for the requirement. This document should be short and concise, not a long treatment full of arcane details and lengthy deliberations on marginal issues. Each of the sections below should not be longer than two or three paragraphs. You may use diagrams or pictures to illustrate important aspects of your system. Project Title Team 1: OurTeam ourteam@nowhere.com Member 1 Member 2 Member 3, etc; add more if needed Abstract: One paragraph with the most important aspects Project Description: Longer, with more details Related Work: Similar methods or systems Requirements: Requirement 1: Short phrase that describes this requirement More detailed description of the requirement Evaluation Criteria: Measurable aspect that determines if a requirement has been met or not Completion Date: Requirement 2: Short phrase that describes this requirement More detailed description of the requirement Evaluation Criteria: Measurable aspect that determines if a requirement has been met or not Completion Date: Requirement 3: (duplicate if you need more) Short phrase that describes this requirement More detailed description of the requirement Evaluation Criteria: Measurable aspect that determines to what degree a requirement has been met Completion Date:

FJK Home CSC 581 Syllabus Schedule Lecture Notes Assignments Project Other Links
© 2000-2025
Franz Kurfess