Component Inspector Date Status Remarks
2.5 DT 19oct12 DONE  
2.5A1 DT 19oct12 DONE  
2.5A2 DT 19oct12 DONE  
2.5A3 DT 19oct12 FIX Prev link should be changed to link to 2.4 Edit Grades
2.5A4 DT 19oct12 FIX Next link should be changed to link to 2.6 Progress Report Tool
2.5A5 DT 19oct12 FIX Up link should be changed to link to 2. Functional Requirements (Project Grader)
2.5A6 DT 19oct12 FIX Top link should link to index (Project Grader)