Component Inspector Date Status Remarks
2.3.2 H1 RDR 21oct05 FIX 2.3.2, not 2.2.2, fix title too
2.3.2 A2 RDR 21oct05 FIX Name makes no sense
2.3.2 P1 RDR 21oct05 FIX 2.X references can be linked now
2.3.2 P2 RDR 21oct05 DONE ws
2.3.2 P3 RDR 21oct05 FIX Schedule is not spelled "Scedule"
2.3.2 P4 RDR 21oct05 DONE
2.3.2 I1 RDR 21oct05 DONE
2.3.2 P5 RDR 21oct05 DONE
2.3.2 P6 RDR 21oct05 DONE
2.3.2 I2 RDR 21oct05 FIX No field for days of week
2.3.2 P7 RDR 21oct05 DONE
2.3.2 P8 RDR 21oct05 DONE
2.3.2 P9 RDR 21oct05 DONE
2.3.2 P10 RDR 21oct05 DONE
2.3.2 P11 RDR 21oct05 DONE
2.3.2 P12 RDR 21oct05 DONE
2.3.2 A3 RDR 21oct05 DONE
Footer RDR 21oct05 FIX needs to have some things set

Obnoxious comment: Does this conform to the users desire or view of how the schedule gets edited?