2.8.8. Exit

When the user selects the Exit command in the File menu, the system begins by checking for an open Scheduler project. If an open project exists, the system saves this project as the default project. When the user launches the Scheduler in the future, this project is opened by default. If an open project exists, the system proceeds by executing the Close Project command. The associated processing for Close Project ensues, including any necessary user interaction with a warning dialog. This is described in section 2.8.7. Close Project. If the user responds at a point such that Close Project is canceled for the current, open project, the Exit operation is also thereby canceled. Once the Close Project command has run to completion, the system proceeds with the Exit operation. The system terminates the current session of the Scheduler, thereby returning the user to the underlying operating environment.


Prev: close | Next: non-functional | Up: file | Top: index