Inspection Report


Component Inspector Date Status Remarks
2.1 DS 12nov09 DONE  
2.1 P1 DS 12nov09 DONE  
2.1.1 DS 12nov09 DONE  
2.1.1 P1 DS 12nov09 DONE  
2.1.1 I1 DS 12nov09 DONE  
2.1.1 P2 DS 12nov09 FIX need a space between pull and down in "standard form of pulldown"
2.1.1 I2 DS 12nov09 DONE  
2.1.1 P3 DS 12nov09 DONE  
2.1.1 P4 DS 12nov09 DONE  
2.1.1 P5 DS 12nov09 DONE  
2.1.1 P6 DS 12nov09 DONE  
2.1.1 P7 DS 12nov09 DONE  
2.1.1 P8 DS 12nov09 DONE  
2.1.1 P9 DS 12nov09 DONE  
2.1.1 P10 DS 12nov09 DONE  
2.1.1 P11 DS 12nov09 DONE  
2.1.1 P12 DS 12nov09 DONE  
2.1.1 P13 DS 12nov09 DONE  
2.1.1 P14 DS 12nov09 DONE  
2.1.1 P15 DS 12nov09 DONE  
2.1 A1 DS 12nov09 DONE  
2.1 A2 DS 12nov09 DONE  
2.1 A3 DS 12nov09 DONE  
2.1.2 DS 12nov09 DONE  
2.1.2 P1 DS 12nov09 DONE