Component Inspector Date Status Remarks
2.5 MFR 23Nov09 DONE  
2.5 P1 MFR 23Nov09 FIX needs to need
2.5 I1 MFR 23Nov09 DONE  
2.5 I2 MFR 23Nov09 DONE  
2.5 P2 MFR 23Nov09 FIX opened to opens
2.5 I3 MFR 23Nov09 FIX remove the toolbar and add the tabs we have in the main UI
2.5 P3 MFR 23Nov09 DONE  
2.5 P4 MFR 23Nov09 FIX "...Figure 3 all...completed." to "...Figure 3 the instructor completes all grading operations.", can click to clicks
2.5 P5 MFR 23Nov09 DONE  
2.5 P6 MFR 23Nov09 FIX it to TestTool, was to is, can go in and mark to goes in and marks, will change to changes
2.5 P7 MFR 23Nov09 FIX can click to clicks, "This will make...column" to "This marks the current student's test as graded by highlighting their name in green in the student column"
2.5 A1 MFR 23Nov09 DONE  
2.5 A2 MFR 23Nov09 DONE  
2.5 A3 MFR 23Nov09 FIX 'up' should link to functional.html
2.5 A4  MFR 23Nov09 DONE