2.4. Generating an Advanced Test

Component

Inspector

Date

Status Remarks
2.4. NB 07may04 DONE None
2.4.P1 NB 07may04 FIX A little bit more of a summary in the opening paragraph is needed.
2.4.I1 NB 07may04 FIX Need a GUI for this section.
2.4.A1 NB 07may04 DONE None
2.4.1. NB 07may04 DONE None
2.4.1.P1 NB 07may04 FIX Combine paragraphs one and two and add more content.
2.4.1.P2 NB 07may04 FIX Combine paragraphs one and two and add more content.
2.4.1.I1 NB 07may04 FIX Also add time to advanced options.
2.4.1.P3 NB 07may04 DONE None
2.4.1.I2 NB 07may04 FIX Add time to advanced options.
2.4.1.P4-5 NB 07may04 DONE None
2.4.1.I3 NB 07may04 DONE None
2.4.1.P6-7 NB 07may04 DONE None
2.4.1.P8-10 NB 07may04 FIX All are part of the same idea. Consider combining these three paragraphs.
2.4.1.I4 NB 07may04 DONE None
2.4.1.P11-12 NB 07may04 FIX Both paragraphs are describing the same GUI in brief detail. Consider combining these paragraphs.
2.4.1.I5 NB 07may04 DONE None
2.4.1.P13 NB 07may04 DONE None
2.4.1.P14 NB 07may04 DONE None
2.4.1.I6 NB 07may04 DONE None
2.4.1.P15 NB 07may04 DONE None
2.4.1.P16 NB 07may04 DONE None
2.4.1.A1 NB 07may04 DONE None
2.4.2. NB 07may04 DONE None
2.4.2.P1 NB 07may04 FIX Need to add more content here.
2.4.2.I1 NB 07may04 FIX

Add a GUI

2.4.2.A1 NB 07may04 DONE None