Project Work Breakdown

Project Work Breakdown


Spec Section Level Team Member Remarks
2.X.Y P5 0.5 Person X This is medium priority for Fisher.

The  following  are  instructions  for  using  this  template; delete these
instructions after installation of this file.
  1. Store a copy of this file in the administration project directory, under the name work-breakdown.html.
  2. Put one table row for each (sub...)section from Section 2 of the requirements spec document. If this is not fine grain enough, add rows for individual paragraphs in a requirements section.
  3. In the Spec Section field, put the number of the section from the requirements specification document, with a paragraph number if necessary. The section/paragraph number should link to the actual section in the requirements specification document.
  4. In the Level field, define the level of completion for the (sub...)section/paragraph, per the levels defined the Milestone 1 addendum Theses levels will be refined in our initial project meetings during the first two weeks of class.
  5. In the Team Member field, assign a project team member for the (sub...)section/paragraph.
  6. In the Remarks field, add any necessary explanatory remarks.