Agenda for the Meeting with Tim on May 27 11AM - 1PM
1. Tim discusses deployment issues, runs Meshkit on laptop, other topics ...
2. Nathaniel and Jon overview in-the-field test plan.
3. Teams show latest developments:
a. Monitor: no-physics feature, MAC address as node ID
b. Middleware: bigger and better test fixture; traceroute working
c. Mesh: trace route data, Jon's setup scripts
4. Q/A session:
a. Any particular requirements for the final deliverable, in addition to
[[Admin.Milestones.Deployment Phase 3 Functional Requirements]]
b. Anything in particular for maintenance documentation?
Minutes:
-
Tim did not understand what the bson versus json issues were. This was cleared
up with further explanation.
-
Replace logo on Github wiki home page with an index that is linked to each
major component of the project.
-
For each component, provide the following information:
-
How to build
-
How to install
-
How to run
-
A design discussion
-
Remove all unnecessary files from the repository, most particularly the
binaries.
-
Merge all branches into master.
-
Remove the build directory entirely, or describe clearly what is in it.
-
Some details for the field tests to be performed in two weeks:
-
The tests labeled "Initial Convergence" and "Convergence" should be re-named
"Routing Performance", to avoid
-
Julie suggest an additional field test to simulate robot power loss. This test
is performed with a stop watch, to simulate the "robot rounds corner" problem.
-
In Monitor UI:
-
Allow the table size to expand when the outer window is expanded.
-
Label nodes with last octet of the IP address.
-
A route must be selectable by clicking on source and destination nodes in the
display.
-
In the final field tests, do traceroute, ping, and bandwidth test between
nodes.