X Group Work Breakdown
| Team Member Name
| Requirements Files
| Specification Files
|
| member 1
|
|
|
| member 2
|
|
|
| member 3
|
|
|
| member 4
|
|
|
| member 5
|
|
|
The following are instructions for filling in this file; delete the
instructions when done.
-
Fill in your group name where "X" appears above.
-
Fill in the member names where member 1 through member 5
appear.
-
As requirements file assignments are determined, fill in the
Requirements Files column for each team member; these are the
.html files stored in the project requirements directory.
-
As specification file assignments are determined, fill in the
Specification Files column for each team member; these are the
.rsl files stored in the project specification directory.