X Team Work Breakdown
| Team Member Name
| Requirements Files
| Specification Files
|
| Name1
|
|
|
| Name2
|
|
|
| Name3
|
|
|
| Name4
|
|
|
| Name5
|
|
|
The following are instructions for filling in this
file; delete the instructions when done.
-
Fill in your team name where "X" appears above.
-
Fill in the member names where Name1 through Name5
appear, adjusting the number of names as necessary for your team size.
-
As requirements file assignments are determined, fill in the
Requirements Files column for each team member; these are the
.html files stored in the project requirements directory. Each team
member is assigned one or more requirements files, most likely more than one.
-
As specification file assignments are determined, fill in the
Specification Files column for each team member; these are the
.rsl files stored in the project specification directory. Each team
member is assigned one or more .rsl files, typically the parts of the
specification that correspond to the parts of the requirements that each team
member works on.