X Group Work Breakdown
| Team Member Name | Requirements Files | Specification Files |
| member 1 | ||
| member 2 | ||
| member 3 | ||
| member 4 | ||
| member 5 |
The following are instructions for filling in this file; delete the instructions when done.
- Fill in your group name where "X" appears above.
- Fill in the member names where member 1 through member 5 appear.
- As requirements file assignments are determined, fill in the Requirements Files column for each team member; these are the .html files stored in the project requirements directory.
- As specification file assignments are determined, fill in the Specification Files column for each team member; these are the .rsl files stored in the project specification directory.