Inspection Test of Impacts

Currently empty. One or more requirements team member needs to write this, to address the following points:

  1. Good things that will happen if the product is installed and used.

  2. Bad things that can happen, including but not limited to the following areas:

    1. Distribution problems

    2. Installation problems

    3. Regular usage problems

  3. Issues raised by Erik Wilkenson's analysis that relate specifically to positive and negative product impacts. If Erik has a specific section devoted to this in his marketing study (new Section 1.6), then you can site that section here, rather than reiterating it.