Inspection Test of Phase 1 Release
Individual Slide Inspections:
Component | Inspector | Date | Status | Remarks |
2.8P1 | MJS | 29oct11 | DONE |   |
2.8.1P1 | MJS | 29oct11 | FIX | I think including numbering into the steps would be a better way for the user to see exactly what they need to be doing. |