Formal Technical Reviews
CPE 308 Procedures


Remember, FTR's have been demonstrated to be the #1 method for improving product quality.

Inspections are internal reviews, FTR's are external reviews.  For CPE 308 FTR's, the reviewers will be another project team.  FTR's must be scheduled at least a week in advance!

Be prepared: Read the resources, assign roles, know your job.
 

Before the FTR:

During the FTR:

At the end of the FTR:


    Reviewers must make a decision:

  1. Accept - the product is acceptable as is.
  2. Rework - accept the product provisionally, minor erors have been encountered and must be corrected, but no additional review will be required.
  3. Reject - the product has severe errors. You need to overhaul the item and schedule another FTR.

After the FTR:

Review Guidelines


Resources

Powerpoint presentation on FTR principles and concepts
NASA's Formal Review Guidebook