Project Teams
The table below lists the teams, their topics, and the final presentation date.Team/Topic | A4 | A5 | ||
Team 1: Time Visualization of Employees | Thu | Timeline Eons | ||
Team 2: 406 Scheduler | Thu | Kinect Rocksmith | ||
Team 3: Planets - CP Portal Redesign | Tue | Pizza Ordering App | ||
Team 4: (Not Used) | ||||
Team 5: CP Portal Redesign Web 2.0 | Thu | |||
Team 6: "Slow Lorises" - Mobile Assistant for Corporate Meeting Environments (iOS) | Thu | |||
Team 7: Morae | N/A | iOS Class |
Instructions
To find the team you are supposed to evaluate, look for your team number in the column on the right, and then do the evaluation of the team that is listed on the left.