When an administrator selects the "General Course Time Constraints" option from the initial
constraints interface shown in
Figure 2.4.1.1,
they will be taken to the Time Constraints interface shown in Figure 2.4.1.1.1
An administrator can click any element of the calendar view in Figure 2.4.1.1 to create a new constraint. Once an administrator creates
the desired constraints, they will click the "Save Constraints" button to apply them to the scheduler tool. The time and day clicked will then
become a new time constraint that the scheduler tool will take into account whenever a schedule is generated.
An filled out time constraint view example is shown below in Figure 2.4.1.1.2.