2.4.1.1 Time Constraints

When an administrator selects the "General Course Time Constraints" option from the initial constraints interface shown in Figure 2.4.1.1, they will be taken to the Time Constraints interface shown in Figure 2.4.1.1.1



Figure 2.4.1.1.1 Constraints interface



An administrator can click any element of the calendar view in Figure 2.4.1.1 to create a new constraint. Once an administrator creates the desired constraints, they will click the "Save Constraints" button to apply them to the scheduler tool. The time and day clicked will then become a new time constraint that the scheduler tool will take into account whenever a schedule is generated. An filled out time constraint view example is shown below in Figure 2.4.1.1.2.



Figure 2.4.1.1.2 Time constraints interface filled in