1.2. System Personnel

The personnel involved in the Scheduler project are organized into the following groups and subgroups:

  1. end users
    1. faculty
    2. student
    3. master system administrators
  2. customers
  3. system developers
  4. software engineering students
  5. outside parties

End users are those who use the Scheduler for its intended purpose. Faculty can use the Scheduler to set their preferences for their needs. Students are able to login and view classes that are available plan a schedule. Master administrators can view/edit all data and create/edit schedules as needed.

The primary customer is Gene Fisher. He is customer representative for his faculty and staff colleagues in the Computer Science department at the California Polytechnic State University, San Luis Obispo. In this representative capacity, Fisher will consult with other potential customers to gather requirements from them, and integrate their requirements with his own.

The primary system developer is Team Infinitech. Their development activities are all those of the software development process, from requirements analysis through product implementation and deployment. They will also conduct the ongoing process activities of testing, configuration, documentation, and project management.

Team Infinitech is comprised of Software Engineering and Computer Science students.

The Scheduler is available as public domain software for use by outside parties. The project directory is located at http://www.csc.calpoly.edu/~alkatz/projects/work/Scheduler.




Prev: problem | Next: setting | Up: intro | Top: index