All functionality of the TestTool program must execute instantaneously, with the exception of the test generation feature of the TestTool system. This function must be completed on the order of minutes. Other network dependent functionality, such as proctoring, must be effectively instantaneous, except for any delays due to network transmission of data from the central host.
The maximum expected sizes of the TestTool program are the following:
The TestTool must be able to operate with tests and databases of sizes larger than these normal maximums. However, the tool need not the meet the previously-enumerated time performance requirements for test creation with databases that are larger than normal maximum sizes.
Next: Qualitative System Characteristics | Up: Non-Functional Requirements | Top: index