The Administrator can set the maximum number of Work Time Units (WTUs) instructors are allowed to work per quarter. Figure 1 shows the initial Max WTUs view, with a default of 12.
This Max WTUs preference is the ultimate rule, while WTU settings in the instructors database (as discussed in section 2.3.3.1. Add Instructors) are of lower priority. Instructor WTUs cannot exceed the amount specified in Overall Schedule Preferences.