2.4.5 Schedule Generation Errors and Conflicts
When generating a schedule, different errors and conflicts can occur that will prevent an optimal schedule from being generated. These errors are described in the following sections:
2.4.5.1 Not Enough Instructors
2.4.5.2 Not Enough Rooms
2.4.5.3 Instructor Preference Conflicts
2.4.5.4 Time Conflicts
2.4.5.5 Room Conflicts
2.4.5.6 Exceeding Work Time Units (WTUs)
Prev:
2.4.4 Viewing Schedule Attributes
|
Next:
2.4.5.1 Not Enough Instructors
|
Up:
2.4 Advanced Schedule Generation and Editing
|
Top:
Index