Detailed Construction Plans.

 

 

Date Due Assignment Comments
Th 1/11

Handout assignments for Release 1
Project Plan - Ben
Detailed Schedule - Tony J., Albert
Lines of Code - Ben and Chris
Change Control Plan - Tony T.
Quality Assurance Plan - Tony J.

Completed
Tu 1/16 Rough Drafts Of Documents Due
Training Plan - Albert
Completed
Th 1/18

Stage 1 Release Date
Assign Release 2 modules

Completed
Tu 1/23 Current Action Items - Ben
Training Plan Team - Al
Meeting Notes - Ben
Staged Delivery Plan - Al, Chris
Integration Plan - Chris
Detailed Schedule - Ben, Tony J
Completed
Th 1/25

PSP Submission Procedure - Tony J
Time Act. Procedure - Ben
Requirements Traceability - John
Visibility - Tony T
Unit Developer Procedure - Cliff
Build Procedure - Chris
Build Report - Chris

Completed
Tu 1/30 Modules coded
New Project - John
Open Project - Cliff
Save - Chris
Int Val - Ben
String Val - Al
New Bundle - Tony J
Close Project - Tony T
Completed
Th 2/1 Modules coded
Create New Key - John
Edit Comments/Edit Key Names - Cliff
Choice Format Test - Chris
Save Loose File - Ben
Save As - Al
Close Loose File - Tony J
Help System - Tony T
Completed
Tu 2/6 Stage 2 Release must be sent to customer TBD
Th 2/8 Integral Test results
Functional PSP form for size and cost submitted for each module
TBD
Tu 2/13 Stage 2 Release Date checklist is completed TBD
Th 2/15

Escape Sequences
Find
Help System
Edit Comments/Edit Key Name/Edit Key Type Menu Open Loose File
Import Bundle (Add Child)

TBD
Tu 2/20

Cut/Copy/Paste
View/Hide Menu
Install Program
Undo/Redo
Default Columns to show in new EditorWindows
(Pref Dlg List Keys Alphabetically (Pref Dlg)
Change Colors (Pref Dlg)
Optional: known defect list

TBD
Th 2/22 All test cases are documented. Unit test results: Assertion testing complete TBD
Tu 2/27 White-box testing complete Black-box testing complete TBD
Th 3/1 Integration test results Regression test results TBD
Tu 3/6 Stage 3 Release must be sent to customer PSP form for size, cost, and quality submitted TBD
Th 3/8 Compile release components Complete checklist and signoff sheet TBD
Tu 3/13 Stage 3 Release Date TBD
Th 3/15 Final Project Submission TBD

 

2/1/01 Updated for all releases Ben
1/23/01 Updated for 206 Ben, Tony J, Al

 