Date Due |
Assignment |
Comments |
Th 1/11 |
Handout assignments for Release 1
Project Plan - Ben
Detailed Schedule - Tony J., Albert
Lines of Code - Ben and Chris
Change Control Plan - Tony T.
Quality Assurance Plan - Tony J.
|
Completed |
Tu 1/16 |
Rough Drafts Of Documents Due
Training Plan - Albert |
Completed |
Th 1/18 |
Stage 1 Release Date
Assign Release 2 modules
|
Completed |
Tu 1/23 |
Current Action Items - Ben
Training Plan Team - Al
Meeting Notes - Ben
Staged Delivery Plan - Al, Chris
Integration Plan - Chris
Detailed Schedule - Ben, Tony J |
Completed |
Th 1/25 |
PSP Submission Procedure - Tony J
Time Act. Procedure - Ben
Requirements Traceability - John
Visibility - Tony T
Unit Developer Procedure - Cliff
Build Procedure - Chris
Build Report - Chris
|
Completed |
Tu 1/30 |
Modules coded
New Project - John
Open Project - Cliff
Save - Chris
Int Val - Ben
String Val - Al
New Bundle - Tony J
Close Project - Tony T
|
Completed |
Th 2/1 |
Modules coded
Create New Key - John
Edit Comments/Edit Key Names - Cliff
Choice Format Test - Chris
Save Loose File - Ben
Save As - Al
Close Loose File - Tony J
Help System - Tony T
|
Completed |
Tu 2/6 |
Stage 2 Release must be sent to customer
|
TBD |
Th 2/8 |
Integral Test results
Functional PSP form for size and cost submitted for each module |
TBD |
Tu 2/13 |
Stage 2 Release Date checklist is completed
|
TBD |
Th 2/15 |
Escape Sequences
Find
Help System
Edit Comments/Edit Key Name/Edit Key Type Menu Open Loose File
Import Bundle (Add Child)
|
TBD |
Tu 2/20 |
Cut/Copy/Paste
View/Hide Menu
Install Program
Undo/Redo
Default Columns to show in new EditorWindows
(Pref Dlg List Keys Alphabetically (Pref Dlg)
Change Colors (Pref Dlg)
Optional: known defect list
|
TBD |
Th 2/22 |
All test cases are documented. Unit test
results: Assertion testing complete |
TBD |
Tu 2/27 |
White-box testing complete Black-box testing complete
|
TBD |
Th 3/1 |
Integration test results Regression test results |
TBD |
Tu 3/6 |
Stage 3 Release must be sent to customer PSP form for
size, cost, and quality submitted |
TBD |
Th 3/8 |
Compile release components Complete checklist and signoff
sheet |
TBD |
Tu 3/13 |
Stage 3 Release Date |
TBD |
Th 3/15 |
Final Project Submission |
TBD |